    The last post of 2025, and as I sit, we’re right in the middle of ‘Betwixt-mas’. That weird time between Christmas and New Year, when the effects of excess cake give rise to the question ‘When Is Bins’? Frankly, I’m dependent on neighbours to know which bin goes out when. However, I am a master of my own destiny when it comes to the farm! Well, sort of.

    Things not covered in this week’s report;

    • The annual pilgrimage North to the in-laws.
    • Unexpectedly large bills.
    • Never ending dog barking.

    Husbandry

    Felis Catus

    The cats seem to be slowly progressing upwards from spiders, through worms and on to mice. They’ve even been spotted making daft attempts on bird.

    The cats are finally mousing.
    The cats are finally mousing.

    The move to mousing is rather welcome as we’re seeing more and more evidence of the mice in our storage area. As much as I don’t mind sharing with wild animals, they are starting to destroy soft furnishings.

    Some of the mice are brought to us; this one wasn't so lucky.
    Some of the mice are brought to us; this one wasn’t so lucky.

    We’re not entirely sure who is the better hunter, but we have seen Bonnie bringing in two small and formerly furry criters. The chewed up ball of mouse above didnt seem to quite make it in the door, much to Bonnies confusion.

    The hunters are getting bolder and have a wider search radius.
    The hunters are getting bolder and have a wider search radius.

    Both cats are continuing to push their hunting boundaries. Bonnie has been seen in the lane, although she may have just been following us! While Clyde has started prowling the field!

    After a long day hunting, they still enjoy a box to sleep in.
    After a long day hunting, they still enjoy a box to sleep in.

    And all this extra activity seems to be tiring them out. I’m not sure if they know about Christmas presents under the tree, but they really should have asked for a new box for their ‘main’ present.

    Porcine

    The piggies are really starting to grow now, and they definitely won’t let us forget a feed. The auto-filling water trough has gone down well; they even seem to have worked out thatthey need to take turns.

    The Kune Kunes have been quite a draw for the locals.
    The Kune Kunes have been quite a draw for the locals.

    They’ve enjoyed a couple of extra feeds in the last week, having become something of a local tourist attraction. Well, the neighbours’ grandkids and other school kids have been to visit.

    The piggies seem rather robust to the cold.
    The piggies seem rather robust to the cold.

    They’ve also been given the last of the windfall before it becomes inedible. That was a very happy day for the piggies. I think they may have gorged themselves as they spent the afternoon lying in something of a dog pile.

    Megashed 2.0

    Plastering Touch Ups

    Last week’s write-up ended with the application of expanding foam and plenty of polyfilla to bridge some of the holes. The gaps were of my own making, where the boarding wasn’t especially tight.

    Gaps around the steelwork are filled and prepared.
    Gaps around the steelwork are filled and prepared.

    Fortunately, the gaps filled up rather well, and once the filler was dry, it could be scraped and sanded back into shape. The final result was far better than I expected.

    The ceiling is fully painted with a white matt emulsion finish.
    The ceiling is fully painted with a white matt emulsion finish.

    With the gaps filled and prepped, I could finish off painting the ceiling. Fortunately, I had precisely the right amount of paint!

    The room is far too 'white' as it stands.
    The room is far too ‘white’ as it stands.

    Ceiling paint work finished and wall primed, the whole room was cleared out. The vapour barrier was tidied up and pinned down ready for flooring.

    Rustic-looking 'village shop' with the pallet stands.
    Rustic-looking ‘village shop’ with the pallet stands.

    With the pallet scaffold piled up outside, the Megashed 2.0 looked rather rustic.

    Top Coat

    A new day, and the final layer of paint could be added!

    'Tranquil Dawn' top coat is applied to the walls.
    ‘Tranquil Dawn’ top coat is applied to the walls.

    I’ve opted for the Dulux colour of the year, Tranquil Dawn. According to various online articles, the colour should promote peace and tranquillity. It was also on offer at B&Q.

    With a bit of help, the walls are covered in double time.
    With a bit of help, the walls are covered in double time.

    I had expected to spend a whole day painting the walls at my usual precise but slow pace. However, a visitor and long-suffering friend arrived, took pity and smashed it out in an hour. His extra height probably helped.

    Final Window

    When we brought the carport down earlier in the year, there was a small incident with one of the window cill pieces. Applying 200kg of flying beam to a plastic trim part doesn’t end well.

    The hole for the last window has been opened.
    The hole for the last window has been opened.

    This meant the installation of the final window had been much delayed. After months of trying to find some second hand trim in a light oak finish, I finally had to bit the bullet and buy some new materials.

    The new sill is attached to the window unit and installed.
    The new sill is attached to the window unit and installed.

    Once the new sill arrived, I could finally install the last window and seal up the whole building. While the addition of the final reclaimed UPVC unit didn’t significantly affect the heat, it certainly helped with humidity.

    Flooring

    With the paint probably still drying on the walls, my attention turned to the flooring. So far, only a thin 9mm sheet of plywood has been in place as the subfloor.

    Primary flooring of 22mm Caberfloor is quick to install.
    Primary flooring of 22mm Caberfloor is quick to install.

    Over the subfloor, I’m installing a 22mm Caberfloor. The tongue-and-groove is glued together as the sheets are installed with a minimum of screws.

    The result is a quieter and more solid feeling room.

    All in all, it took about three hours to get the flooring down. The trickiest bit is around the door where the ductwork comes up from the plant room.

    Within hours of the flooring going down, the carpet is laid.
    Within hours of the flooring going down, the carpet is laid.

    While I was on such a roll with finishing the interior, I just couldn’t stop. By 9 pm, I had recovered the underlay and carpet from the downstairs of the farmhouse and reinstalled it in the shed. This is a level of comfort we’ve not enjoyed for a long time!

    Minecraft now dominates the activities in the shed.
    Minecraft now dominates the activities in the shed.

    And the following day, we started moving in. Once I had my computer over from the farmhouse, the children descended, and much of the rest of the day was spent on Minecraft. A fantastic way to end the week.

    Vehicles

    Motorbike – BMW F650 ST

    Regular readers will remember I had a rather unexpected but welcome trip out on a motorbike last week. Well, during the day out, I might have done a thing!

    The bike doesn’t stay in one piece for long!

    Through hit-and-miss texts when the signal allowed, I ended up buying my first motorbike. And as I had not yet returned the team bike trailer, an early Monday morning saw this beautiful machine brought up from the Midlands.

    A clean bike is easier to work on, so it pops out for a bath.
    A clean bike is easier to work on, so it pops out for a bath.

    From the picture above, I’m sure you can see that within hours of the bike arriving at the farm, the boys were round and had it stripped down! However, towards the end of the week, I had the back wheel back on and took her outside for an overdue wash down.

    The wet is baked off in the afternoon sun.
    The wet is baked off in the afternoon sun.

    In a rare breakthrough of warming sun, the bike was introduced to some of the other farm equipment and allowed to bake. Of course, it rained before I took her back inside! I won’t give too many updates on here; I have a whole separate blog for car and automotive things, BXProject.co.uk, which I hope to get back into shortly.


    And that’s all for 2025.

    I’ll be taking a few weeks’ rest from the write-up at the start of 2026, so don’t panic if you don’t hear from us for a few weeks. If nothing else, I need a few weeks to catch up physically from the Megashed 2.0 build.

    Until next time.
    NothingToFarm

  • Wk32 – The Unexpected Week Off ‘Work’

    Wk32 – The Unexpected Week Off ‘Work’

    As we reach the end of December at the farm, a most peculiar thing happened. Apparently, I had a lot more holiday left than I had expected, and was effectively ‘sent home’. This might have meant a whole week on the farm, but frankly, it came as such a surprise that I was mostly unprepared. However, it might give me a glimmer of hope of being in the Megashed 2.0 for Christmas.

    Things not covered in this week’s report;

    • Lots of bike and bike part movement with the ‘team’ trailer
    • Visits from friends and relatives in the pre-Christmas chaos
    • An unexpected, but not too painful, school nativity.

    Husbandry

    The animals continue to be a general source of hilarity. The addition of a Christmas Tree has been incredibly entertaining for the cats. But the pigs haven’t been left out of the seasonal gifts.

    Felis Catus

    I’m not really sure why we bothered dressing this Christmas tree this year. The cats have been systematically stripping both the lights and the baubles.

    The cats have slowly unwrapped the Christmas tree.
    The cats have slowly unwrapped the Christmas tree.

    As I sit and write, the bottom third of the tree is free of decorations, with all the baubles moved a few feet away from the cats. Not only have they been climbing the tree, but they’ve also taken to ‘wrestling’ under the lowest branches, much to the demise of the remaining ornaments.

    Cats will find water in the strangest of places.
    Cats will find water in the strangest of places.

    While the cats always have access to fresh water that is changed regularly, they really do love to get in the shower. Neither have been brave enough to join us in full flow, but as soon as the water goes off and the door opens, they’re drinking from the shower tray.

    Who's been sleeping in MY bed!!
    Who’s been sleeping in MY bed!!

    They also continue to sleep, and leave little muddy footprints in places they shouldn’t be. Namely, my bed. However, finding Clyde tucked in under the sheets makes me suspicious that my eldest might be encouraging them!

    Porcine

    The mild weather has been joyous for the bacon, sorry, I mean the pigs. Warmer temperatures seem to have spurred the routing and general turning over of the soil.

    Ah, snuggly happy rashes.
    Ah, snuggly happy rashes.

    And in the sunnier moments, they do rather love to sunbathe. Usually, they only snuggle up in a row when they’re in the pig-wam, but I did catch them all snuggled up together, catching a few rays.

    The auto-water trough will save us a lot of work.
    The auto-water trough will save us a lot of work.

    After many failed attempts to buy water troughs at farm auctions, I finally bit the bullet and ordered new ones from APUK. The water had been brought over to the field before the pigs had arrived, so connecting to the supply was relatively straightforward.

    Megashed 2.0

    A huge amount of the unexpected free time was, not surprisingly, spent on the Megashed. Really, there is only ‘decoration’ left, but this is tiring work on such a grand scale.

    New plaster is nearly dry after less than a week.
    New plaster is nearly dry after less than a week.

    With the plasterwork pretty much dry, preparation could start on decorating. This meant sanding down all the surfaces to remove any defects, and this took absolutely ages. My body still hurts.

    The floor is scraped and scrubbed before painting can begin.
    The floor is scraped and scrubbed before painting can begin.

    Once the walls were all sanded and dusted, I was nearly ready for the mist coat on the new plaster. Before any wet paint was applied, the whole floor was scraped and brushed to minimise contamination.

    Condensation in the Megashed will be a real challenge.
    Condensation in the Megashed will be a real challenge.

    Throughout the painting process, I continued to battle moisture. Between the moisture in the plaster and the added water in the paint, I seemed to be pulling out 10 litres of water per day with the dehumidifier.

    A misting layer of paint will help future layers bond to the new plaster.
    A misting layer of paint will help future layers bond to the new plaster.

    After what felt like a lifetime of preparation, I was finally ready for the first coat. This application of thinned paint ensures the final paint correctly bonds to the new plaster and does not peel or flake as the wall’s moisture levels change over time.

    Many hours spent rolling can lead to snow blindness.
    Many hours spent rolling can lead to snow blindness.

    After a few days, all the surfaces had two coats of a 50:50 mix of Leyland Contract Matt paint and water, well mixed, of course. The ceiling would get a final coat of a 1:9 ratio as the final covering.

    The next step in the decorating will be to plug the holes.
    The next step in the decorating will be to plug the holes.

    Decoration ended with expanding foam and a significant Polyfilla session. Joints around the rafter ties and steelwork were just a bit too wide to get the plaster into, so they needed a touch of remedial work.

    Vehicles

    With a few days off, all the vehicles have had their levels checked and a bit of a runaround. Some have been more fun than others, if a little impractical.

    Tractors

    In view of making the farm look a little less abandoned, there was a lot of half-arsed tidying up going on. From moving dropped trees to cutting hedges. It is a drop in the ocean of what is needed, but something is better than nothing!

    The seventy-four-year-old Fergie proves its value yet again.
    The seventy-four-year-old Fergie proves its value yet again.

    It’s only four months since the tree in the garden was dropped by the power board, and finally, I had time to move some of the timber. The ground was rather wet, so I took the opportunity to run the Fergie out, having the best traction-to-weight ratio for the job. Despite being 74 years old, she started on the button and performed faultlessly.

    Who needs a wheelbarrow when you have a tractor?
    Who needs a wheelbarrow when you have a tractor?

    The Ford 7610 also had a decent run-out, making an afternoon trip down the road to a mate’s house to move some materials. What better way to spend an unexpected day off than a nice local drive? Certainly cheaper than therapy, and it beats unloading tonne bags with a shovel.

    Landy

    The Landy also saw a bit of attention. Since the recent brake changes, I’ve found that it stinks when stopped at traffic lights. I had also noticed something hanging down from the front subframe.

    Not a mouse house, but a LOT of flora and fauna.
    Not a mouse house, but a LOT of flora and fauna.

    Up on the ramp, I discovered a considerable amount of debris wedged under the car in various nooks and crannies. A mixture of big stick and airline saw most of a tree appear from the various trays. I’ve recently driven through a lot of flood water, so I’m hoping this was floating debris, rather than a mouse house!

    Motorbike

    After passing my CBT and motorbike theory earlier in the year, the week ended with a bloody fantastic opportunity. A late scheduled lesson with my favourite team at Aintree Motorbike School.

    Not a bale or cone in sight, almost eerie.
    Not a bale or cone in sight, almost eerie.

    An early start made me rather nostalgic for the many, many early mornings I’ve had here with Liverpool Motor Club. However, on this occasion, I wasn’t here for bale tossing or even four-wheel motorsport.

    A mighty BMW F-series GS has taken me on an incredible adventure.
    A mighty BMW F-series GS has taken me on an incredible adventure.

    I had come for a lesson on this little beast. And what a fantastic session it was, lovely to get out with some great people. Something may have happened during the ride, which we will have to wait until the next blog to really get into!

    That’s all for this week. With Christmas upon us, I’m doubtful that the shed will be done for Christmas Day, but it’s relatively close to completion. I reckon finishing the interior in 2025 is more than possible. Maybe in time for a NYE party?

    That’s all for now
    Nothing To Farm.

  • Wk31 – Getting Plastered

    Wk31 – Getting Plastered

    A massive milestone in the Megashed 2.0 build was reached this week, with a few days of mudflinging required to finish the walls. With only a few weeks left until Christmas, I’ve certainly got my work cut out to get things finished before the big man arrives.

    Things not covered in this week’s report;

    • The Christmas tree has been bought.
    • The wedding tree has finally gone back into the ground.
    • Some of the apple trees have been ‘pruned’

    Husbandry

    Felis Catus

    The cats continue to amuse us. They still have their mad half hour every night, and now have a mad half hour around five am, which is nice.

    Cats are not in their own beds!
    Cats are not in their own beds!

    They seem to have discovered how to get into the eldest’s bedroom. Or at least that’s what she tells me. I haven’t seen them master the door handles yet, so I’m a little suspicious.

    Hunted and gathered a caterpillar.
    Hunted and gathered a caterpillar.

    The hunter-gatherers have stepped up their game a little, at least in terms of quantity if not quality. We’ve had many worms delivered, a caterpillar, and a rather large, fat mouse that wasn’t even dead! Que much screaming from the kids while we captured and released the poor little thing.

    Porcine

    The pigs are practically hibernating at the moment. Other than feeding, they’re tending to hide out of the rain.

    Bacon sizzling in the midday sun.
    Bacon sizzling in the midday sun.

    However, we have seen some new behaviour in the past week. In a rare sunny moment in between the showers, they were out sunbathing!

    Some of the pigs prefer bed over sunbathing.
    Some of the pigs prefer bed over sunbathing.

    Well, half of the herd were out sunbathing anyway. The other half continued their ‘bed day’ unhindered by the weather in the Pigwam.

    Megashed 2.0

    Last week ended on a bit of an emotional roller coaster. The plasterboard was all installed, but I was broken. Physically, rather than mentally, but I certainly felt those boards through most of the week.

    Plastering Day 1

    The considerable efforts to get the plasterboarding finished were worthwhile, though. On Tuesday morning, the plasterer arrived and got started on the walls.

    Day one of plastering, and the walls and one gable are mudded.
    Day one of plastering, and the walls and one gable are mudded.

    Despite the scoffing of some, the plasterer also approved of the farm scaffold. Once we had a few more pallets in place, the apex of the gable was easily reached with the trowel.

    As drying begins, I look forward to painting.
    As drying begins, I look forward to painting.

    Day one was something like a ten-hour day for the one-man team. I’m super impressed with the work ethic. And the finish is excellent.

    Plastering Day 2

    A few days later, the plasterer returned to finish the other gable wall and the ceiling. This was no mean task, as that ceiling apex is much higher than it looks in the pictures.

    Day two sees the ceiling and final wall plastered.
    Day two sees the ceiling and final wall plastered.

    My patchwork quilt of boarding didn’t make the job any easier, with a lot of joining tape to bury in the scrim. Another late night, and some last-minute fixes to the guy’s transit van, and the plastering was finished.

    Plaster slugs are picked up off the floor.
    Plaster slugs are picked up off the floor.

    A few days later, a mammoth cleanup was undertaken, recovering snots and taking plaster lumps off the subfloor. Then there was a waiting game to give the plaster plenty of time to dry before paint could be applied.

    Windows

    By the end of the week, the back wall was sufficiently dry that I was happy to start installing the remaining windows. I wasn’t happy to start the work until the plaster was reasonably firm.

    First we make the holes on the inside.
    First we make the holes on the inside.

    The vapour barrier and breather membrane were trimmed back to expose the outer cladding. Then an angle grinder was applied from the inside edges in a few places so that the outline could be found on the outside.

    Then we make the holes on the outside.
    Then we make the holes on the outside.

    These short cuts were then joined up from the outside and the ‘excess trim’ removed. I already have a plan for reusing these removed sections!

    Then we fill the holes.
    Then we fill the holes.

    With window ‘reveals’ where finished with some 2×6″ timbers that extend past the metal sheets to give something of a sealed edge. In time, the outside will be trimmed with angle sections.

    In the first 48 hours, the plaster dries very quickly.
    In the first 48 hours, the plaster dries very quickly.

    For now, the last well to be plastered was too wet to risk installing the final windows. However, with windows on both sides of the shed, a continuous stream of air through the building should see the plaster dry super quickly.

    Vehicles

    The new battery and tyres on the Freelander have come in rather useful, given the potholed and flooded roads locally. I certainly appreciate being able to walk outside and know the car will start.

    Mini-digger returns from its long sabbatical.
    Mini-digger returns from its long sabbatical.

    And a fully working Land Rover came in handy for repatriating the minidigger, which is about to become rather busy! Although the ground is currently rather damp, there are a lot of digging tasks for the little 8015 over Christmas.

    Oi, oik, come back with my digger!

    That assumes I can actually get some time on it. Within minutes of unloading the trailer, some heated-hoodied thief had jumped on and shot off into the garden. God only knows what chaos will follow.

    Next week is set to be a rather frantic one. Hopefully, I can get plenty of the Megashed painted, and the garden tidied up with the digger. Who needs a spade!

    That’s all for now
    Nothing to Farm.

  • Wk30 – All Wrapped

    Wk30 – All Wrapped

    A very late, and probably very short write-up for this week. Internet issues have made uploading images rather tricky, and most of the week’s work has focused on the Megashed.

    Things not covered in this weeks write-up;

    • A trip out to Delamere forest
    • Failure mode investigation on an Ambulance
    • Apple tree pruning course

    Husbandry

    There hasn’t been too much to report on the pig front. They’re certainly getting bigger, and I’m not sure I can call them piglets anymore. I also have a ‘least favourite’ who will likely be off for their blanket first.

    Feline

    Like the pigs, the kittens are rather too large to continue with the rather cuter name, so I’d better start referring to them as ‘the cats’. Clyde is slowly starting to get sufficient confidence that he’s less likely to bolt if he meets a person while outside.

    Cat (formerly kitten) brings in its first kill.
    Cat (formerly kitten) brings in its first kill.

    And Bonnie has her first confirmed kill. Okay, not the biggest kill by any means, but she did bring it back to the house to share her success. Since this vole, the cats have brought a daily worm for the door mat. I’d rather they found the mouse that has been stealing pig food, but I’m sure that will come!

    MegaShed

    The MegaShed has nearly killed me this weekend. After the positive start to boarding out for plastering, I started looking for someone to throw mud on the walls. Pretty quickly I found a recomended plasterer with almost immediate availabilty. Que total panick boarding!

    Walling Off

    Focus was first pointed in the direction of the walls, for the simple reason that they where lower than the ceiling!

    Apex boarding completes the gable walls.
    Apex boarding completes the gable walls.

    The gable walls got their pointly bits

    Insulation and a vapour barrier are added to the front wall.
    Insulation and a vapour barrier are added to the front wall.

    The last of the insulation went into the front wall.

    And boarding finishes all the wall sections.
    And boarding finishes all the wall sections.

    Before the boarding was added to finish the front wall.

    Insulating the Ceiling

    Saturday mornings’ focus shifted to getting the ceiling insulated.

    Attention then turned to the ceiling, starting with noggins.
    Attention then turned to the ceiling, starting with noggins.

    Noggins went in first, at a board’s width to give me something to land the plasterboard sheets onto. Hopefully, this will help get a nice flat finish!

    Followed by bringing the vapour barrier up.
    Followed by bringing the vapour barrier up.

    Insultation then went into the lower portion, and the vapour barrier wrapped over.

    Final FarmSpec scaffolding helps install the lower boards.
    Final FarmSpec scaffolding helps install the lower boards.

    Using FarmSpec scaffolding, the lower boards were lifted into place and screwed to the rafters and noggins. Quite how I managed this on my own, I have no idea.

    The front ceiling is insulated and barriered in one hit.
    The front ceiling is insulated and barriered in one hit.

    The front portion of the ceiling needed a whole sheet of barrier, so it was easier to do all the insulation and wrapping in one go. A 100mm wide PVC jointing tape joins the vapour barrier from the wall to the ceiling.

    The ceiling vapour barrier is sealed up, ready for boarding.
    The ceiling vapour barrier is sealed up, ready for boarding.

    One at a time, the lower ceiling boards could be lifted up and fixed in place. After any holes in the vapour barrier are sealed up, of course.

    A little help over hear.

    Sunday afternoon saw a knight in shining armour arrive to get the higher ceiling panels in place. There was absolutley no way to get these in on my own, so it was a definite requirement to have another pair of hands.

    A little trimming in the apex aids board installation.
    A little trimming in the apex aids board installation.

    A little trimming of the apex boarding allowed the ceiling panels to be slotted over the wall panels. This small gesture made getting the boards in so much easier.

    Oh, I get high with a little help from my friends.
    Oh, I get high with a little help from my friends.

    Once the four main board where lifted into place, smaller and more manageable pieces could be cut.

    Some infil panels are more complicated than others.
    Some infil panels are more complicated than others.

    Some of the remaining shapes were certainly more tricky than others. And amazingly, this panel dropped straight in without modifying, unlike the other side.

    The final pieces of the definitely-not-curved ceiling.
    The final pieces of the definitely-not-curved ceiling.

    And while the ceiling was not intended to be curved, it kind of happened anyway. By late sunday night, the boards where all installed, but there was one thing left to do.

    Window Openings

    So that the windows could be edged, the previously measured window openings need to be removed.

    Will the plasterboard hole match the woodwork?
    Will the plasterboard hole match the woodwork?

    This would be something of a moment of truth for my measuring skills. Perhaps not surprisingly, punching the scored plasterboard through was very satisfying.

    My assistant had a smashing time.
    My assistant had a smashing time.

    So satisfying that my assistant reappeared for a smashing time. And amazingly, the marked openings matched the frame work.

    Ready for Mud

    After a tidy up and brush over from the beautiful assistant, the Megashed was ready for plastering.

    All boarded up and ready for plastering.
    All boarded up and ready for plastering.

    This is by far the biggest area I have ever boarded over, and the most complicated once it got to the ceiling. And while getting this whole room boarded on my own, with a little help, nearly broke me, the finish is very satisfying!

    Lessons have definitely been learned, but hopefully this effort will get me into the MegaShed for Christmas.

    Until next time
    Nothing to farm

  • Wk29 – Boarding Up

    Wk29 – Boarding Up

    What seemed like a relatively relaxed weekend appears to have seen an incredible amount of work completed. The weather seems to have settled into a fairly regular pattern: cold in the day, rainy in the evening. At least now that the roof is on the Megashed, we can chop and change between inside and outside chores.

    Things not covered this week;

    • An unexpected power cut creates village gossip.
    • A lot of woodchips have found a forever home.
    • Work is slowly starting on gutting the house.

    Husbandry

    The animals continue to eat, sleep and grow at a healthy rate. Our fears of badgers, foxes or owls otherwise engaging with the animals seem to be waning.

    Felis Catus

    Ah, the cats. I’ve never had two cats before, and I’m discovering the joys of having a pair. They’re entertaining when playing with us and when playing with each other.

    The kittens aren't in a bag, they're in a box.
    The kittens aren’t in a bag, they’re in a box.

    The madness is still there, but it seems to be a little more restrained now. I suspect this is simply because ‘cabin fever’ has waned now that they’re outside.

    Sleepy kittens seem to need more rest after long days of roaming.
    Sleepy kittens seem to need more rest after long days of roaming.

    They are surprisingly inseparable. For a brother and sister, they seem to really enjoy each other’s company. Bonnie especially enjoys preening her brother.

    I see no kittens in this picture, nope, not one. (There are two!)
    I see no kittens in this picture, nope, not one.

    Although the cats have been out for a few weeks now, they’re still a little timid when outside. They’re also pretty terrible at playing hide-and-seek. I definitely can’t see Clyde in the bushes.

    The Henry Ferguson Cat Hammock.
    The Henry Ferguson Cat Hammock.

    The terrible duo have also found some really interesting snoozing spots. I would never have considered the steering wheel of the Fergie to be a hammock, but how wrong I was.

    The cat flap gives the kittens freedom to come and go.
    The cat flap gives the kittens freedom to come and go.

    The cats have also received a cat flap this week, and once they worked it out, they seem very happy to have some freedom.

    Porcine

    The pigs continue to eat, drink and poop at alarming rates. They’re slowly starting to ‘beg’ for extra food as we come past in the evening. They certainly seem to kick up a fuss.

    Piggies are always happy when they're eating.
    Piggies are always happy when they’re eating.

    But some gentle petting at feeding time is settling them into being around us. I’m hoping this will help with moving them around, if they don’t think they’ll be picked up and driven to a new home every time we come near.

    Megashed 2.0

    With the roof mostly installed and the weather being relatively moist, Megashed’s work this week has focused on the interior.

    Sheeting Up

    The key to keeping the shed warm isn’t just in the insulation, but in controlling air flow. To manage airflow, the building must first be sealed. My best chance of sealing is through a barrier.

    A vapour barrier will help to control moisture in the Megashed.
    A vapour barrier will help to control moisture in the Megashed.

    Wrapped around the entire interior is a vapour barrier. This green sheeting, if installed correctly, should form a near-airtight boundary. Each wall is carefully covered with the overlaps sealed with a 100mm wide PVC tape.

    The sheeting will stop air from passing from inside to out and back.
    The sheeting will stop air from passing from inside to out and back.

    By installing the vapour barrier, the air inside the building can be managed. Heated, mixed, dried, or cooled, the building’s air can then be conditioned as needed. Arguably, this layer is as important as the insulation in keeping the room warm in winter and cool in summer.

    Holes in the vapour barrier are sealed up.
    Holes in the vapour barrier are sealed up.

    To get the best from the vapour barrier, every hole, perforation or imperfection is sealed up. Where the staples secure the sheet to the wooden frame, each one is carefully covered with a piece of aluminium tape.

    Deliveries

    There’s been a spate of ever-bigger vehicles on-site, with varying levels of driver skill. At the start of the week, one lorry decided it was too big to make the turn and unloaded on the road. Giant bags blocking the gate made for a fun surprise when I got home in the heavy rain.

    By far the biggest vehicle we've had on the farm so far.
    By far the biggest vehicle we’ve had on the farm so far.

    Fortunately, the Travis Perkins driver had a lot more skill after some gentle persuasion. This is by far the biggest vehicle I’ve had on site, but now I know they can get in and out, although I might make the entrance a little bigger.

    Torrential rain as the plasterboard is delivered. As usual.
    Torrential rain as the plasterboard is delivered. As usual.

    And they were delivering a pack of plasterboard for the Megashed. And, as always, when I order plasterboard, the lorry wasn’t quite unloaded before an unexpected and rather heavy rain shower hit.

    Rafter Ties

    I’ve been struggling to get enough height to install the rafter ties. Fortunately, with the plasterboard moved inside, it gave the extra few inches needed to reach the roof comfortably.

    Ridge ties add significant strength to the roof.
    Ridge ties add significant strength to the roof.

    I’m pretty happy that the rafter ties aren’t structurally necessary; however, they will help lower the ceiling’s overall apparent height. There are a few left to install, but I can’t reach the others yet.

    Boarding Up

    With the vapour barrier installed and minor holes sealed up, the plasterboard could now be installed. Once long ago, I bought a giant box of plasterboard screws. Could I find them? Nope.

    The first sheets of plasterboard going up feel like a significant milestone.
    The first sheets of plasterboard going up feel like a significant milestone.

    A brief trip to Screwfix and I could start to fix the boards. As there is still some primary flooring to go down, the boards need to sit off the floor a little. And this is why the noggins between the studs were set to 123cm from the floor plate.

    The laser level compensates for the natural bends in a timber frame.
    The laser level compensates for the natural bends in a timber frame.

    Using the laser level, I could set the board to be perfectly level. This exposed the twists and bends in both the floor and wall; however, this should minimise the gaps between boards.

    Window Details

    I’m not quite ready to install the windows fully, but I do have to prep for them.

    Careful measurement and the windows are marked up on the plasterboard.
    Careful measurement and the windows are marked up on the plasterboard.

    The boards over the windows were measured, marked and pre-scored. I hope that when I come to knock the plasterboard out of the window openings, it comes out neatly!

    Before the boarding goes up over the windows, the vapour barrier needs trimming.
    Before the boarding goes up over the windows, the vapour barrier needs trimming.

    Before the boards go up, the vapour barrier around the windows needs trimming and joining. The final seal will come when the widows are installed.

    While I'm not living on a prayer, I am halfway there with boarding.
    While I’m not living on a prayer, I am halfway there with boarding.

    And as if by magic, the window holes have vanished. Hopefully, all the prep has now been done, and installing the window units should be that little bit easier.

    Vehicles

    After the recent brake replacement and battery change on the Freelander, it seems the other vehicles have become a little jealous.

    Tractor

    When trying to jump-start the Freelander with the tractor a few weeks ago, I noticed the tractor battery voltage was relatively low, even with the engine running.

    Knowing the battery wasn't charging, I probably shouldn't have parked in a bog.
    Knowing the battery wasn’t charging, I probably shouldn’t have parked in a bog.

    That possibly should have been a warning. A non-charging battery would soon prevent the tractor from starting. And I perhaps should have thought about this before parking the tractor in a bog.

    Still young at just 7800 hours.
    Still young at just 7800 hours.

    Apparently, she’s not looking too shabby for forty years old and 7800 hours. But she’s certainly crying out for a bit of attention.

    The alternator belt is worn out and no longer drives the generator.
    The alternator belt is worn out and no longer drives the generator.

    At least finding the charging issue wasn’t too difficult. The alternator belt was slacker than a slack thing. Not stretched but simply worn out and loose, with no adjustment left. A new belt is on order.

    Land Rover

    The Land Rover also had a bit more love and finally received some new dancing shoes. The front tyres were very much at the end of their life, and the lack of traction was becoming obvious.

    New dancing shows on the Freelander.
    New dancing shows on the Freelander.

    I may well have made the mobile tyre fitters’ day. By the time he turned up rather late in the evening on Friday, the Freelander was hosed down, on the ramp, with the wheels off. I’m fairly sure he’d never had a customer like me before.

    The new tyres clearly have some serious grip.
    The new tyres clearly have some serious grip.

    And how are the new tyres? Well, they certainly have some depth to the tread, and hold the road far better than the tyres that came off!

    Trailer

    And not to be left out, the big trailer also had TLC.

    Infill boards on the trailer should make the collection of bulk bags and equipment easier.
    Infill boards on the trailer should make the collection of bulk bags and equipment easier.

    As the car transporter seems to be moving far more than just cars these days, I really needed a deck and a bit of an infill. Fortunately, some recently donated scaffold boards seem to be just the job.

    So despite the weather, we got through a lot of jobs this weekend. Hopefully, I can make some progress on the Megashed next week, aiming to get the space plastered, dried, and painted before the end of the year.

    And that’s all for now, folks.
    Nothing to Farm.

  • Wk28 – The Roof Is On

    Wk28 – The Roof Is On

    One thing I’m really starting to understand about farming is the relentlessness of the weather. Beginning the week at sub-zero temperatures, and finishing with a few inches of rain over the weekend. Neither end of the week has been the most pleasant for roofing work. But against the odds, more progress has been made than I ever expected.

    Things not covered in this week’s write-up;

    • I found out the wife’s car is Rear Wheel Drive.
    • Holes have been dug down to find foundations.
    • The kids were sent out to litter pick, but it didn’t go well.

    Husbandry

    There is a general calmness when it comes to the animals at the moment. The fear of losing a pig (one way or another) overnight has abated. With the kittens now allowed out, the panic of getting in through the door without letting them out is lost. Generally, all the animals are just a little more settled.

    Felis Catus

    The cats are slowly finding their feet outside. Bonnie is still quite timid, but Clydes confidence is gradually building. They’ve not quite made it to the farm’s furthest boundaries, but Clyde has been out to the top of the drive.

    And in a flash, they were gone.
    And in a flash, they were gone.

    The kittens’ morning routine hasn’t changed much. They’re still zipping around like angry wasps come five AM, and there is a good chance of bitten toes if you don’t get out of bed and feed them soon enough.

    Upside down kitten sleeping.
    Upside-down kitten sleeping.

    The pair are slightly less bonkers in the evening, but I think this is from all the daytime flying around. Clyde is growing at an astounding rate and already feels fully grown. However, it seems Bonnie has the bigger appetite, eating far more often.

    Porcine

    Like the cats, it seems the Kune Kunes have us well trained. Heaven forbid they’re not fed at 7 am prompt, they’ll certainly let us know if we dare to have a lie-in. And they are equally boisterous when it gets to 3pm in anticipation of someone coming home.

    Some days I think I should have only got three, three little pigs.
    Some days I think I should have only got three, three little pigs.

    Food is definitely the way to their hearts, and a bit like puppies, they are not beyond begging if you are in eyesight. There aren’t many apples left on the trees, but they’re still enjoying the occasional lunchtime sna-pple.

    These pigs are like kids to Haribo when it comes to their nuts.
    These pigs are like kids to Haribo when it comes to their nuts.

    Interestingly, just one of the pigs has started rooting quite heavily in places. While a relatively minor behaviour change, it does seem to be only the single piglet digging in. Regardless, they’re all growing well, and I’m not sure I could pick them up any more, even if I could catch them.

    Apis

    The bees have all been wrapped up for the winter now. The extra insulation of the small hives should reduce the energy loss in the cold months.

    Beeses in their houses.
    Beeses in their houses.

    Although the bees are relatively self-sufficient and generally aren’t seen, they were coming for a visit quite regularly. As their journeys over to our house have dropped off, their absence is definitely noted.

    Farm Cottage

    While the construction focus has been on getting the Megashed 2.0 complete, so the office can be set up, some work has started inside the cottage. If only to avoid the cold and rain.

    Inside work is best in the cold.
    Inside work is best in the cold.

    To find the floor and locate the foundations, the former pantry needed to be cleared out. With a little help from mum and dad, the cladding and shelves were stripped out last weekend, and this weekend saw the walls stripped.

    Running out of power

    Rather frustratingly, the Freelander has been suffering from an increasingly frequent flat battery. While it hadn’t quite left me in the lurch away from the house, the frequency of jump starts was becoming problematic.

    One of these things is not like the others.
    One of these things is not like the others.

    Yes, it is winter, and I’m using more electricity for the heated seats and the windscreen. Yes, the battery is nearly five years old. But even after a full charge on the CTEK, the battery was flat within a couple of days. Finally, I caved and bought a new battery.

    This single piece of plastic added about 10 minutes to the battery install.
    This single piece of plastic added about 10 minutes to the battery install.

    Having been a bit unimpressed with Varta batteries dying at almost exactly five years, regardless of use or treatment, I’ve moved to Yuasa. Despite the size difference, I was somewhat hampered in the battery swap until I realised this bonus plastic piece needed removing!

    The new battery is snug as a bug in a rug.
    The new battery is snug as a bug in a rug.

    Once installed, charged, and the battery management reset, the starting has been much improved. So far, no flat battery. The quiescent battery current meets spec, and the alternator seems healthy, so all being well, this new battery should see us happy for another five years or more.

    Wet Weather

    I mentioned that the weather has been rather wet, with plenty of localised flooding. The front field has been turning into a pond in the worst of it, though it drains pretty quickly.

    Diverting your floodwater onto my property isn't cool!
    Diverting your floodwater onto my property isn’t cool!

    However, a walk around the block might have highlighted an additional water source. Where the main road dips, it seems someone has dug through our hedge to run the water off the road and onto our field. I really hope this doesn’t kill the grass. This isn’t the only time someone has taken liberties with our boundary. Clearly, someone local has an ‘it’s only a farm‘ attitude.

    Megashed 2.0

    The urgency of completing the Megashed has increased as temperatures have dropped. Currently, I’m working from the cottage and with no heating, office work is getting ever less efficient.

    Roof Sheet Delivery

    Monday saw the arrival of the metal for the roof, having been ordered from MCS Roofing a week earlier. For the expenditure, the actual delivery was rather underwhelming. Ten nested roofing panels really don’t seem like a lot, until you try to pick them up!

    Top-notch sheets from MCS in Juniper Green.
    Top-notch sheets from MCS in Juniper Green.

    However, these are top quality, having opted for Tata Rural Clad sheets in a 0.7mm. They’re heavy-duty sheets, and probably excessive for this little shed of mine; however, they should outlast me!

    Eaves Felt Support

    Before the sheets could go up, a few additional trimmings needed to go up. First off were ‘eaves felt support’ panels.

    A brief moment of sunshine in an otherwise freezing weekend.
    A brief moment of sunshine in an otherwise freezing weekend.

    These plastic trays, made from recycled material, help to guide the rain away from the breather membrane and into the gutter. IN turn, this should help to keep the barge board dry.

    Plenty of overhang in the eaves.
    Plenty of overhang in the eaves.

    Such a simple, cheap piece of trim, this seemed like something of a no-brainer. I guess only time will tell. However, for the time being, they really tidy up the underside of the eaves.

    Front Roof Sheets

    And finally, after weeks of building up to this point, a break in the weather on Friday means the first sheets could go up.

    The front roof sheets go up in just 45 minutes.
    The front roof sheets go up in just 45 minutes.

    And they practically flew up. Although the first sheet took a little while to position, once we had a method, the rest shot up. Amazingly, the whole front of the roof went up in just 45 minutes. Not bad for amateurs. They were also lined up by eye, and over the five-metre length, the complete panel only runs out by 5mm!

    A piece of perfection will be in the screw head alignment.
    Perfection lies in the screw head alignment.

    Once the top was loosely fitted, the bottom row of screws was marked before the fixings were applied. By the time I’d finished, the rain had arrived, and frankly, I forgot to get a picture of the roundabout-straight row of screws.

    Insulating out the cold

    In the later, darker, colder hours, installing roof sheets is less than optimal. Especially when the plastic-coated cladding is lubricated with a misting of water. This means working on the inside of the building once the light and temperature drop.

    Wall insulation is nearly complete, keeping the noise out.
    Wall insulation is nearly complete, keeping the noise out.

    Speaking of temperature, the evening task has been to install insulation in the wall cavities. While this isn’t really making much difference to the temperature yet, it has made a big difference to the interior sound.

    Gable Cladding

    In between the showers and the breaks in other tasks, the remainder of the gable cladding has gone up.

    The gable end cladding is complete.
    The gable end cladding is complete.

    For recycled sheets, often cut with a recip saw, the finish is fantastic. The overlap line between the upper and lower sections is remarkably straight for ‘by eye’ measurements.

    Rear Sheets

    Saturday started as ‘all go’ for installing the rear roof cladding. The weather was scheduled to be a little variable, so every minute counted in the drier spells.

    The eaves finisher is located at the rear of the building.
    The eaves finisher is located at the rear of the building.

    Like the front, the rear received an eaves felt support panel to deflect moisture from the wooden structure.

    One sheet at a time, and the rear section of the roof goes up.
    One sheet at a time, and the rear section of the roof goes up.

    Then, having learned a bit of process from the day before, the first sheets were offered up, stitched together and aligned. Again, the alignment was by eye, and I might regret that this time.

    Installing the rear roof was much quicker than the front.
    Installing the rear roof was much quicker than the front.

    Between each panel, a lapping tape was used to help bond the lips, stopping moisture and air from blowing up between the panels. On the rear, the runout was closer to 15mm, but once the finishing cladding and gutters are on, this won’t be visible.

    Another Cold Night

    Overnight, the temperature dropped to sub-zero again, and back inside I went.

    The wall and roof membrane are joined in the eaves.
    The wall and roof membrane are joined in the eaves.

    Where the wall membrane meets the roof membrane, both sections were lapped with a breathable tape. This dark coloured joiner helps to bring the two sections of membrane together, but really it helps keep the cold out while the heater is running!

    Roof insulation may be going up pre-emptively.
    Roof insulation may be going up pre-emptively.

    Once the sections of breathable sheet are joined, the loft insulation is offered up. This might be getting ahead of myself a little, but as the roof is nearly complete, I hope it won’t get wet!

    Unplanned Guttering

    After getting drenched multiple times while walking out the shed door on Friday and Saturday. In order to combat this deluge to the neck, Sunday morning saw a trip to Screwfix for their finest flow plast guttering.

    The guttering over the front door should keep the rain off.
    The guttering over the front door should keep the rain off.

    And while probably not the greatest priority, it was satisfying to get installed. The relatively short run of the gutter went up rather quickly.

    Ridge Finish

    While it was great to get the gutter up, I should have kept a better eye on the weather. By the time the barge flashing was installed between the shed and the shippon, the rain had arrived.

    Ridge work in the freezing cold rain was less than fun.
    Ridge work in the freezing cold rain was less than fun.

    Not only was it wet and rainy, but it was also really rather cold. Practically icy everywhere it ran. Down my back, down up front and up my legs. It took an excessively long shower to get warm again.

    The complete roof is a huge milestone for the Megashed and the farm.
    The complete roof is a huge milestone for the Megashed and the farm.

    But despite frozen toes and testicles, by midday all the roof sheets were on, the ridge flashing installed and finally weatherproof.

    Compared to the original Megashed, this one is just so much bigger, and the size has definitely caused some challenges. From the roof’s apex, on the plastic finished wet panels, the journey to the floor is a lot more rapid. Then there’s getting onto the roof in the first place. And of course, working on the inside at height causes its own problems. I might need to buy some scaffolding!

    And that’s a wrap for this week. Hopefully, next week I can get the inside wrapped and semi-air-tight. Wouldn’t that be something!